Custom Search
|
|
|
||
TM 9-2330-394-13&P
STABILIZER BAR REPLACEMENT - Continued
0091 00
INSTALLATION, LMTVT - Continued
Tighten self-locking nut (2) to 300-366 lb-ft (406-496 Nm).
7.
8.
Perform steps (3) through (7) on left side of stabilizer bar.
9.
Remove two trestles from under trailer.
OPERATIONAL CHECK
Operate trailer and check for normal operation (WP 0011 00, Towing Trailer).
END OF WORK PACKAGE
0091 00-25/26 Blank
|
||