Custom Search
|
|
|
||
TM 9-2330-394-13&P
AIR TANK DRAIN VALVE REPLACEMENT - Continued
0093 00
OPERATIONAL CHECK
1.
Couple trailer (WP 0009 00, Coupling Trailer). Allow towing vehicle time for air pressure to reach
normal operating pressure.
2.
Uncouple trailer (WP 0012 00, Uncoupling Trailer). Do not drain air tank as part of trailer
uncoupling task.
3.
Check around drain valve for air leaks.
4.
Couple trailer (WP 0009 00, Coupling Trailer).
5.
Road test trailer and check for proper brake operation.
6.
Uncouple trailer (WP 0012 00, Uncoupling Trailer).
END OF WORK PACKAGE
0093 00-4
|
||