Custom Search
|
|
|
||
TM 9-2330-394-13&P
VENT VALVE ASSEMBLY REPLACEMENT - Continued
0095 00
INSTALLATION - Continued
3.
Connect two air hoses (1) to fittings (2).
OPERATIONAL CHECK
1.
Couple trailer (WP 0009 00, Coupling Trailer). Allow towing vehicle time for air pressure to reach
normal operating pressure.
2.
Uncouple trailer (WP 0012 00, Uncoupling Trailer). Do not drain air tank as part of trailer
uncoupling task.
3.
Check around vent valve and hoses for air leaks.
4.
Couple trailer (WP 0009 00, Coupling Trailer).
5.
Road test trailer and check for proper brake operation.
6.
Uncouple trailer (WP 0012 00, Uncoupling Trailer).
END OF WORK PACKAGE
0095 00-4
|
||