TM 9-2330-398-10
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS) (continued)
ITEM TO
PROCEDURE
NOT FULLY
ITEM
CHECK/
MISSION[
NO.
INTERVAL
SERVICE
CAPABLE IF:
27
During
Emergency
Make sure all valves are closed. Operate
Emergency valve A control
Valve and
emergency valve A control handle, and make
handle will not actuate
Vent
sure cable is actuating emergency valve shut-
emergency valve shut-off
off control and opens vent on top of semitrailer.
control, or vent fails to open.
28
After
Piping
a.
Inspect all pipes for dents and cracks.
a. Pipes are damaged to the
System
extent that fuel flow will be
restricted Pipes are cracked,
allowing fuel leakage
b.
Drain water from piping system drains.
2-22