TM 9-2350-222-10-2
OPERATE WINCH (PERFORM AFTER WINCHING OPERATIONS) - Continued
5. Move WINCH CONTROL lever (J) up to reel in cable slack. Release WINCH CONTROL lever (J) when cable (D) is snug.
6. Deleted.
7. Deleted.
8. Deleted.
9. Aline two cable guide pins (A) and tabs (B) with slots (C). Push guide pins (A) in place and turn to lock.
Change 3
2-285