C9, TM 9-2350-230-12
TABLE 7-2. SERVICE UPON RECEIPT OF MISSILES - Continued
ITEM
ACTION REQUIRED
MISSILE AFT COVER:
Shear Screws
Must be tight.
Ejector Rim
Must not be dented.
Adapter Stop
Must not be dented.
Not rolled or defaced.
Observation Windows
Tight and not cracked. No evidence of internal moisture.
Firing Contractor
Must fit tight.
Diaphragm
Sealed and has no punctures.
NOTE. IF missile fails to pass any of the above checks,
repack missile in its container and return to ammunition supply
point. Report discrepancy on DA Form 2415.
Figure 7-1. Missile inspection points
7-3