PRELIMINARY PROCEDURE: LOWER MOLDBOARD
TO GROUND. STOP VEHICLE ENGINE AND APPLY
BRAKES.
REMOVE/INSTALL
SIX
SCREWS
AND
REMOVE/INSTALL
THREE
SCREWS
AND
LEFT HYDRAULIC CYLINDER HOSES GUARD
FRONT MANIFOLD TUBE ASSEMBLY GUARD.
ASSEMBLY.
REMOVE/INSTALL TUBE ASSEMBLY GUARD.
REMOVE/INSTALL
SIX
SCREWS
AND
RIGHT HYDRAULIC CYLINDER HOSES GUARD
ASSEMBLY.
REMOVE/INSTALL LEFT AND RIGHT HYDRAULIC
HOSES GUARD ASSEMBLIES.
REMOVE/INSTALL
THREE
SCREWS
AND
GUARD.
REMOVE/INSTALL CONTROL LINKAGE GUARD.
AT 19664
REMOVE/INSTALL
TWO
SCREWS
AND
LOCKWASHERS SECURING
CONTROL
LEVER
GUARD.
REMOVE/INSTALL CONTROL LEVER GUARD.
Figure 3-24. Removal or installation of hydraulic system armor guards (sheet 1 of 2).
3-37