PARTS LIST
CLAMP BOLT ASSEMBLY
ITEM
PART NAME
9" AND 10 K
10"
13"
14 "
16" & 16/24"
17"
NO.
PART NO.
PART NO.
PART NO.
PART NO.
PART NO.
PART NO.
1
CLAMP (2-3)
*AS1577NK1
*AS1577R1
*AS1577T1
*AS1577F1
*AS1577H1
*AS1577H1
2
PIN
160 X 19
160 X 19
160 X 19
160 X 21
160 X 21
160 X 21
3
CLAMP STUD
PT1585NR1
PT1585NR1
PT1585T1
PT1585F1
PT1585H1
PT1585H1
4
RAISING BLOCK
----------
----------
PT1586T1
PT1586F1
PT1586H1
PT1586GJ1
5
WASHER
161 X 22
161 X 22
161 X 22
161 X 22
161 X 22
161 X 22
6
CLAMPING NUT
PT283NK1
PT283NK1
PT283NK1
PT283NK1
PT283NK1
PT283NK1
7
CLAMP BOLT EQUIPMENT
(1-4-5-6)
CE307NK
CE307R
CE307T
CE307F
CE307H
CE307GJ
INSTRUCTION
The internal grinder attachment mounts o the compound rest top. Adjust the belt to proper tension
n
with belt adjusting screw item 23. The grinder spindle and the jackshaft spindle run on high speed ball
bearings which require no adjustment.
LUBRICATION - GRINDER
Remove oil screws periodically, items 12 and 18, and add a few drops of spindle bearing oil at both
points. Use SBL CE1600 oil or equal.
LUBRICATION - MOTOR (1 PHASE)
Motors having ball bearings are packed with grease sufficient for about two years of normal service.
At the end of that time, the bearings should be cleaned thoroughly of the old grease and repacked about
one-third full with General Electric ball-bearing grease.
53