TM 9-4110-246-14
TO 40R7-5-10-1
SUBJECT INDEX
Subj/Para
M
Replacement, Right, Center, and Left
Maintenance Allocation Chart (MAC), . Appx. B
Ceiling Panel Assemblies and
Maintenance forms and Records, ...............1-2
Door Canopy, ...................................... 3-14
Maintenance Procedures,
S
Direct Support, .......................................4-2
Scope, ........................................................ 1-1
Maintenance Procedures, Unit, .................3-12
Service, Upon Receipt of Equipment, ......... 3-6
Male Receptacle:
Site and Shelter Requirements, .................. 3-5
Remove/Install, ....................................3-34
Special Tools, TMDE and Support
Test, .....................................................3-34
Equipment, ............................................ 3-3
O
Spring Clips (and Hex Wrenches),
Operating Instructions on Decals
Remove/lnstall, .................................... 3-42
and Instruction Plates, ...........................2-6
Strainer, Remove/Install, .......................... 3-15
Operating Procedures, ................................2-4
Summary Procedure, ................................ 3-13
Operation Under Unusual Conditions, ........2-7
Switch and Switch Cover,
Operation in Salt-Water Areas, ..............2-8
Remove/Install, .................................... 3-38
Operation Under Rainy or Humid
Switch, Test, ............................................. 3-39
Conditions, .............................................2-7
T
Outside Drain, Remove/Install, .................3-16
Technical Principles of Operation,
P
Thermometer, Remove/Install, .................. 3-40
Padlock and Chain, Remove/Install, .........3-22
Tools and Test Equipment
Pilot Light Cover and Pilot Light Housing
Requirement.................................... Appx. B
Assembly, Remove/Install, ...................3-32
Troubleshooting, Direct
Pilot Light Housing Assembly, Test, ..........3-33
Support and General
Preliminary Servicing and Adjustment
Support .................................................. 4-1
of Equipment, .........................................3-9
Troubleshooting, Unit, .............................. 3-11
Preparation for Movement, ..........................2-5
U
Preparation for Shipment, .........................3-46
V
Preparation for Storage, ............................3-45
Vapor Proof Light Fixture,
Preventive Maintenance Checks and
Remove/Install, .................................... 3-36
Services (PMCS), Operator, ........................2-2
Test, .................................................... 3-37
Preventive Maintenance Checks and
W
Services (PMCS), Unit, ........................3-10
Wall Structure Panel, Assemblies
Principles of Operation, Technical,
Procedures, Summary, ..............................3-13
and Door Frame Panel),
Procedures, Unit Maintenance, .................3-12
Replacement, ............................................ 3-29
R
Walk-in Door Assembly,
References,.......................................... Appx. A
Remove/Install, ......................................... 3-21
Wiring, Electrical, ....................................... 3-8
Subj/Para
Refrigerator Panels, Repair, .......................4-3
Reporting Equipment Improvement
Recommendations, ................................1-4
INDEX-2