TM 9-4110-256-14
5-30.
ISOLATION VALVES REPLACEMENT .
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Equipment Conditions:
Materials/Parts:
Anti-Seize Tape
a. Removal.
(1) Remove two isolation valve caps (1).
(2) Loosen two flare nuts (2) and move copper tubing (3) away from isolation valve (4) being careful not to
bend or kink tubing.
(3) Remove two isolation valves (4).
Figure 5-26. Isolation Valves.
5-55