Figure 1-0. Refrigeration Unit - TM-9-4110-258-130018CHAPTER 1 INTRODUCTION - TM-9-4110-258-130019SECTION II EQUIPMENT DESCRIPTION - TM-9-4110-258-130020LOCATION AND DESCRIPTION OF MAJOR COMPONENTS. - TM-9-4110-258-130021Figure 1-1. Major Components - TM-9-4110-258-130022 EQUIPMENT DATA.SECTION III PRINCIPLES OF OPERATION - TM-9-4110-258-130024Figure 1-2. Electrical System - TM-9-4110-258-130025Figure 1-3. Electrical Schematic - TM-9-4110-258-130026Figure 1-4. Electrical Wiring Diagram (Sheet 1 of 2) - TM-9-4110-258-130027Figure 1-4. Electrical Wiring Diagram (Sheet 2 of 2)Cooling CycleFigure 1-5. Refrigeration System - TM-9-4110-258-130030Figure 1-6. Refrigeration Schematic - TM-9-4110-258-130031Figure 1-7. Air FlowCHAPTER 2 OPERATING INSTRUCTIONS - TM-9-4110-258-130033OPERATING CONTROLS AND INDICATORS - TM-9-4110-258-130034Figure 2-1. Operating Controls and Indicators - TM-9-4110-258-130035FAULT CONTROLS AND INDICATORS. - TM-9-4110-258-130036Figure 2-2. Fault Controls and Indicators - TM-9-4110-258-130037SECTION II PREVENTIVE MAINTENANCE CHECKS AND SERVICESFigure 2-3. Operator's PMCS Routing DiagramTable 2-1. Operator Preventive Maintenance Checks and Services - TM-9-4110-258-130040Table 2-1. Operator Preventive Maintenance Checks and Services - Continued - TM-9-4110-258-130041Table 2-1. Operator Preventive Maintenance Checks and Services - Continued - TM-9-4110-258-130042Table 2-1. Operator Preventive Maintenance Checks and Services - Continued - TM-9-4110-258-130043Table 2-1. Operator Preventive Maintenance Checks and Services - Continued - TM-9-4110-258-130044Table 2-1. Operator Preventive Maintenance Checks and Services - Continued - TM-9-4110-258-130045Table 2-1. Operator Preventive Maintenance Checks and Services - Continued - TM-9-4110-258-130046Table 2-1. Operator Preventive Maintenance Checks and Services - Continued - TM-9-4110-258-130047Table 2-1. Operator Preventive Maintenance Checks and Services - Continued - TM-9-4110-258-130048Table 2-1. Operator Preventive Maintenance Checks and Services - Continued - TM-9-4110-258-130049Table 2-1. Operator Preventive Maintenance Checks and Services - Continued - TM-9-4110-258-130050SECTION III OPERATION UNDER USUAL CONDITIONS - TM-9-4110-258-130051Figure 2-4. Operating Controls and Indicators - TM-9-4110-258-130052SHUTDOWN PROCEDURES. - TM-9-4110-258-130053Figure 2-5. Decals and Instruction Plates (Sheet 1 of 2) - TM-9-4110-258-130054Figure 2-5. Decals and Instruction Plates (Sheet 2 of 2) - TM-9-4110-258-130055SECTION IV OPERATION UNDER UNUSUAL CONDITIONS - TM-9-4110-258-130056CHAPTER 3 OPERATOR MAINTENANCE INSTRUCTIONS - TM-9-4110-258-130057MALFUNCTION INDEX - TM-9-4110-258-130058SECTION III OPERATOR'S MAINTENANCE PROCEDURES - TM-9-4110-258-130059UNIT MAINTENANCE INSTRUCTIONS - TM-9-4110-258-130061Figure 4-1. Wall Opening DimensionsFigure 4-2. Installation - TM-9-4110-258-130063PRELIMINARY SERVICING OF EOUIPMENT.Figure 4-4. Refrigeration Valve Setting for Normal OperationPRELIMINARY ADJUSTMENT OF EQUIPMENT. - TM-9-4110-258-130066Figure 4-6. Preliminary Adjustment - TM-9-4110-258-130067SECTION IV UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - TM-9-4110-258-130068Figure 4-7. Lubrication - TM-9-4110-258-130069Leakage Definition for Unit PMCSTable 4-1. Preventive Maintenance Checks and Services for Model F9000RETable 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130072Table 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130073Table 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130074Table 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130075Table 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130076Table 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130077Table 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130078Table 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130079Table 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130080Table 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130081Table 4-1. Preventive Maintenance Checks and Services for Model F9000RE - Continued - TM-9-4110-258-130082SECTION V UNIT TROUBLESHOOTING INSTRUCTIONSTROUBLESHOOTING. - TM-9-4110-258-130084TROUBLESHOOTING (CONT) - TM-9-4110-258-130085TROUBLESHOOTING (CONT) - TM-9-4110-258-130086TROUBLESHOOTING (CONT) - TM-9-4110-258-130087SECTION VI UNIT MAINTENANCE INSTRUCTIONSTOP PANEL (EVAPORATOR) REPLACEMENT.SIDE PANELS (EVAPORATOR) REPLACEMENT.Figure 4-10. Side PanelsCONDENSER COIL GUARD REPLACEMENT.Figure 4-11. Condenser Coil GuardWIRES. CABLES AND HARNESSES TESTING, REPAIR, AND REPLACEMENT.Figure 4-12. Wire Cables and HarnessesWIRES, CABLES AND HARNESSES TESTING. REPAIR, AND REPLACEMENT. - ContinuedTable 4-4. Wire List - TM-9-4110-258-130097Table 4-4. Wire List ContinuedTable 4-4. Wire List - Continued - TM-9-4110-258-130099 INDICATORS/LAMPS DS1. DS2. OR DS3 TESTING AND REPLACEMENT.Figure 4-13. Indicator/LampTOGGLE SWITCH S1 TESTING AND REPLACEMENT. - TM-9-4110-258-130102Installation. - TM-9-4110-258-130103HOUR METER M1 TESTING AND REPLACEMENT. - TM-9-4110-258-130104Figure 4-15. Hour meterCIRCUIT BREAKER CB1 TESTING AND REPLACEMENT. - TM-9-4110-258-130106Installation. - TM-9-4110-258-130107THERMOSTAT S3 OR SWITCH (HEATER LOCKOUT) S9 TESTING AND REPLACEMENT.Figure 4-17. ThermostatRemoval - TM-9-4110-258-130110Installation. - TM-9-4110-258-130111FUSES F1 AND F2 TESTING AND REPLACEMENT. - TM-9-4110-258-130112Installation.. - TM-9-4110-258-130113MOTOR STARTER K1 TESTING. REPAIR, AND REPLACEMENT.Repair. - TM-9-4110-258-130115Installation. - TM-9-4110-258-130116CONTACTOR (POWER RELAY) K2 TESTING AND REPLACEMENT. - TM-9-4110-258-130117Installation.. - TM-9-4110-258-130118CONTACTOR (POWER RELAY) K5 TESTING AND REPLACEMENT.Removal. - TM-9-4110-258-130120CONTROL RELAYS K3 AND K4 TESTING AND REPLACEMENT. - TM-9-4110-258-130121Installation. - TM-9-4110-258-130122DEFROST TIMER TM1 TESTING AND REPLACEMENT. - TM-9-4110-258-130123Figure 4-23. Defrost Timer - TM-9-4110-258-130124Installation. - TM-9-4110-258-130125 PUSH SWITCHES S6 AND S7 TESTING AND REPLACEMENT.Installation. - TM-9-4110-258-130127Installation. - TM-9-4110-258-130128V-BELT REPLACEMENT AND ADJUSTMENT. - TM-9-4110-258-130129Figure 4-25. V-BeltPULLEY REPLACEMENTSHEAVE REPLACEMENT. - TM-9-4110-258-130132Figure 4-27. SheaveAC MOTOR B2 TESTING AND REPLACEMENT. - TM-9-4110-258-130134 Installation. - TM-9-4110-258-130135 Installation. (CONT)FLANGE BEARINGS REPLACEMENT. - TM-9-4110-258-130137CONDENSER FAN REPLACEMENT. - TM-9-4110-258-130138Figure 4-30. Condenser FanEVAPORATOR FAN REPLACEMENT. - TM-9-4110-258-130140Installation. - TM-9-4110-258-130141SOLENOID VALVE L1 (LIQUID LINE) TESTING AND REPAIR. - TM-9-4110-258-130142Installation. - TM-9-4110-258-130143SOLENOID VALVE L2 (DEFROST LINE) TESTING AND REPAIR. - TM-9-4110-258-130144Installation. - TM-9-4110-258-130145 THERMOMETER TESTING AND REPLACEMENT.Figure 4-34. ThermometerRemoval. - TM-9-4110-258-130148ELECTRIC HEATERS HR1. HR2. AND HR3 TESTING AND REPLACEMENT.Figure 4-35. Electric HeatersTHERMOSTATIC SWITCH S8 TESTING AND REPLACEMENT.Figure 4-36. Thermostatic SwitchRemoval. - TM-9-4110-258-130153TEMPERATURE SWITCH S4 REPLACEMENT.Figure 4-37. Temperature SwitchGASKET REPLACEMENT. - TM-9-4110-258-130156Figure 4-38. GasketInstallation. - TM-9-4110-258-130158BARREL BOLTS REPLACEMENT.SECTION VII PREPARATION FOR STORAGE OR SHIPMENT.Figure 4-40. Refrigeration System Pump DownLONG TERM STORAGE OR SHIPMENT. - TM-9-4110-258-130162CHAPTER 5 DIRECT SUPPORT MAINTENANCE INSTRUCTIONS - TM-9-4110-258-130163SECTION II DIRECT SUPPORT MAINTENANCE PROCEDURES - TM-9-4110-258-130164CONTROL BOX COVER REPAIR. - TM-9-4110-258-130165Repair. - TM-9-4110-258-130166CIRCUIT BREAKER COVER REPAIR. - TM-9-4110-258-130167Repair. - TM-9-4110-258-130168FAN DRIVE SHAFT REPLACEMENT. - TM-9-4110-258-130169SERVICE MANIFOLD INSTALLATION. - TM-9-4110-258-130170Figure 5-4. Service Manifold Installation - TM-9-4110-258-130171Removal. - TM-9-4110-258-130172DISCHARGING THE REFRIGERANT SYSTEM. - TM-9-4110-258-130173Figure 5-5. Discharging Refrigerant - TM-9-4110-258-130174 PURGING THE REFRIGERANT SYSTEM.Figure 5-6. Nitrogen Tank Connection - TM-9-4110-258-130176BRAZING/DEBRAZE PROCEDURE. - TM-9-4110-258-130177Braze. - TM-9-4110-258-130178Braze. - CONTLEAK TESTING THE REFRIGERANT SYSTEM. - TM-9-4110-258-130180Testing. - TM-9-4110-258-130181EVACUATING THE REFRIGERANT SYSTEM. - TM-9-4110-258-130182EVACUATING THE REFRIGERANT SYSTEM - CONTCHARGING THE REFRIGERANT SYSTEM. - TM-9-4110-258-130184Figure 5-8. Refrigerant Charging (Total System) - TM-9-4110-258-130185Partial Charge. - TM-9-4110-258-130186Figure 5-9. Refrigerant Charging (Partial System/Small Quantity Charge)Partial Charge - CONTREFRIGERANT SYSTEM PRESSURE CHECKTable 5-1. Pressure Temperature Relationship of Saturated Refrigerant R-134a - TM-9-4110-258-130190Table 5-1. Pressure Temperature Relationship of Saturated Refrigerant R-134a - TM-9-4110-258-130191DEHYDRATOR REPLACEMENTInstallation. - TM-9-4110-258-130193STRAINER REPLACEMENT Installation. - TM-9-4110-258-130195ISOLATION VALVES REPLACEMENTInstallation. - TM-9-4110-258-130197RECEIVER AND FUSIBLE PLUG REPLACEMENTFigure 5-13. ReceiverPRESSURE REGULATOR VALVE (DISCHARGE) REPLACEMENTPRESSURE REGULATOR VALVE (CRANKCASE) REPLACEMENTFigure 5-15. Pressure Regulator Valve (Crankcase)CHECK VALVE REPLACEMENTInstallation. - TM-9-4110-258-130204METAL HOSE ASSEMBLY (DISCHARGE) REPLACEMENTFigure 5-17. Metal Hose Assembly (Discharge)METAL HOSE ASSEMBLY (SUCTION) REPLACEMENT. - TM-9-4110-258-130207ACCUMULATOR AND FUSIBLE PLUG REPLACEMENT.Figure 5-19. Accumulator - TM-9-4110-258-130209SOLENOID VALVE (LIQUID LINE) REPAIR AND REPLACEMENT. Installation. - TM-9-4110-258-130211SOLENOID VALVE (DEFROST LINE) REPAIR AND REPLACEMENT.Installation. - TM-9-4110-258-130213STOP VALVE (LIQUID LINE) REPLACEMENT. - TM-9-4110-258-130214STOP VALVE (DEFROST LINE) REPLACEMENT. - TM-9-4110-258-130215SIGHT INDICATOR REPLACEMENT. - TM-9-4110-258-130216Figure 5-24. Sight IndicatorCONDENSER COIL REPLACEMENT. - TM-9-4110-258-130218Installation. - TM-9-4110-258-130219TUBING AND FITTINGS TESTING. REPAIR. AND REPLACEMENTFigure 5-26. Tubing And FittingsDIFFERENTIAL OIL PRESSURE SWITCH S5 REPLACEMENT. - TM-9-4110-258-130222DIFFERENTIAL OIL PRESSURE SWITCH S5 REPLACEMENT. - Continued Installation - TM-9-4110-258-130224DUAL PRESSURE CONTROL SWITCH S2 REPLACEMENT. - TM-9-4110-258-130225Figure 5-28. Dual Pressure Control SwitchPRESSURE GAGE (LOW) REPLACEMENT.Figure 5-29. Pressure Gage (Low)PRESSURE GAGE (HIGH) REPLACEMENT. Installation. - TM-9-4110-258-130230HEAT EXCHANGER REPLACEMENT. - TM-9-4110-258-130231Installation. - TM-9-4110-258-130232EXPANSION VALVE REPLACEMENT. - TM-9-4110-258-130233Figure 5-32. Expansion ValveEVAPORATOR COIL REPLACEMENT. - TM-9-4110-258-130235Figure 5-33. Evaporator CoilInstallation. - TM-9-4110-258-130237COMPRESSOR B1 SERVICE. TESTING, REPAIR. AND REPLACEMENT.Testing. - TM-9-4110-258-130239Figure 5-34. Compressor (Sheet 1 of 2)Figure 5-34. Compressor (Sheet 2 of 2)Disassembly. - TM-9-4110-258-130242Assembly. - TM-9-4110-258-130243 Installation. - TM-9-4110-258-130244CONDENSER ENCLOSURE REPAIR.PLATES (DATA) REPLACEMENTDOORS/COVER REPAIR AND REPLACEMENTAPPENDIX A REFERENCES - TM-9-4110-258-130249APPENDIX B MAINTENANCE ALLOCATION CHART (MAC) - TM-9-4110-258-130251Maintenance Functions - TM-9-4110-258-130252Explanation of Columns in the MAC, Section II - TM-9-4110-258-130253Explanation of Columns in the Tools and Test Equipment Requirements, Section III - TM-9-4110-258-130254Section II. MAINTENANCE ALLOCATION CHART - TM-9-4110-258-130255Section II. MAINTENANCE ALLOCATION CHART - CONT - TM-9-4110-258-130256Section II. MAINTENANCE ALLOCATION CHART - CONT - TM-9-4110-258-130257Section III. TOOLS AND TEST EQUIPMENT - TM-9-4110-258-130258APPENDIX C COMPONENTS OF END ITEM (COEI) AND BASIC ISSUE ITEMS LIST - TM-9-4110-258-130259SECTION III BASIC ISSUE ITEMS LIST - TM-9-4110-258-130260APPENDIX D ADDITIONAL AUTHORIZATION LIST - TM-9-4110-258-130261APPENDIX E EXPENDABLE AND DURABLE ITEMS LIST - TM-9-4110-258-130263SECTION II EXPENDABLE AND DURABLE ITEMS LIST - TM-9-4110-258-130264SECTION II EXPENDABLE AND DURABLE ITEMS LIST - CONT - TM-9-4110-258-130265APPENDIX F ILLUSTRATED LIST OF MANUFACTURED ITEMS - TM-9-4110-258-130267SECTION II - TM-9-4110-258-130268SECTION II - TM-9-4110-258-130269Figure F-1. Tube, Copper Straight, Various - TM-9-4110-258-130270Figure F-3. Tube, Receiver to Filter Drier, Part Number 151K0052-1Figure F-5. Gasket, Control Box, Side, Part Number 152K0037Figure F-7. Gasket, Circuit Breaker Panel, Part Number 152K0117Figure F-10. Gasket, Outside, Right/Left Side, Part Number 152K0160Figure F-12. Tube Assembly, Outlet, Condenser Coil, Part Number 152K0171Figure F-13. Tube Assembly, Outlet, Solenoid Valve (Liquid Line), Part Number 152K0172Figure F-14. Tube, Outlet, Sight Glass, Part Number 152K0173Figure F-16. Tube, Outlet, Accumulator, Part Number 152K0175Figure F-18. Tube, Outlet, Vibration Isolator (Discharge Line), Part Number 152K0177Figure F-20. Tube Assembly, Outlet, Strainer, Part Number 152K0179Figure F-23. Tube, Heat Exchanger to Tube, Part Number 152K0195Figure F-24. Tube, Tube to Expansion Valve, Part Number 152K0196Figure F-26. Tube, Tee to Distributor, Part Number 152K0198Figure F-28. Tubing, Insulation, Part Number 152K0000-1V57Figure F-32. Tube Assembly, Outlet, Handvalve To Sight Glass, Part Number 152K0180-1Figure F-33. Tube Assembly, Outlet, Solenoid Valve (Defrost Line), Part Number 152K0182-1Figure F-35. Tube Assembly, Outlet, Receiver To Dehydrator, Part Number 152K0205-1APPENDIX G MANDATORY REPLACEMENT PARTS - TM-9-4110-258-130289APPENDIX G MANDATORY REPLACEMENT PARTS - CONT - TM-9-4110-258-130290TM-9-4110-258-13 Refrigeration Unit Mechanical 9K BTU Electric Model F9000RE (4110-01-394-6473) Manual