ARMY TM 9-4120-380-14
NAVY EE-000-BA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-21
4.54
THERMOSTAT (S2) This task covers inspection, testing, removal and installation.
INSTALLATION
a. Fungus proof thermostat (9) per MIL-V-173
CAUTION
Ensure ground strap is connected to mounting bolt to prevent damage to thermostat.
b. Place thermostat (9) in mounting position
c. Install four lockwashers (7), flat washers (8), and nuts (6)
CAUTION
Ensure capillary line is not kinked or mashed to prevent damage to thermostat
d. Install sensing bulb (2) with two screws (1), flat washers (4), clamps (5), and locknuts (3).
e. Reconnect leads and remove tags
Figure 4-44. Thermostat (S2)
4-117