ARMY TM 9-4120-380-14
NAVY EE-000-BA-MMA-010 7053-AC
AIR FORCE TO 35E9-136-21
5.31. EXPANSION VALVE (V6) (LIQUID QUENCH). - Continued
INSTALLATION
a.
Position sensing bulb (16) into retaining clamps (17).
b.
Tighten two screws (18) and nuts (19) in sensing bulb retaining clamps (17).
c.
Install two sensing bulb line clamps (14) with two screws (13) and locknuts (15).
d.
Install two line clamps (9) with screw (8) and locknut (10).
FOLLOW ON PROCEDURES
a.
b.
5-73