4-47. ACCUMULATOR
This task covers:
Inspection
INITIAL SETUP:
Tools:
Tool Kit, service, refrigeration unit
Equipment Conditions:
Power off at power source.
Both front door assemblies removed. See para 4-17.
Both side door assemblies removed See para 4-19.
General Safety Instructions:
Disconnect input power to the unit before performing any internal maintenance.
Voltages used can kill. Shutting the unit off at the thermostat does not
disconnect unit power.
a.
Look in right side door assembly at the top of the compartment and ensure nut (1, Figure 4-43) is rnounted on
accumulator stud (2)
b.
Check the fittings (3) on the accumulator (4) for leaks.
If leaks are present.
contact Direct Support
Maintenance.
c.
Install both side door assemblies. See para 4-19.
d.
Install both front door assemblies. See para 4--17.