TM 9-4120-395-14&P
(3)
Leak test all newly connected joints and those in the repair area. See para 5-8.
(4)
Evacuate and charge the refrigerant system. See para 5-9 and 5-10.
(5)
Install both front door assemblies. See para 4-17.
Figure 5-2. Drier
5-21