TM 9-4120-403-14
Figure 4-1. Unpacking
c. Remove packaging. Remove cushioning from top and sides.
(1)
Level A/B Pack. Remove barrier by cutting as close as possible to the heat-sealed seams. Fold away
from air conditioner cabinet. Remove desiccant and technical publications envelope. Put publications in a safe place.
(2)
Level C/B Pack. Remove polyethylene shroud from air conditioner cabinet by removing tape and folding
away from cabinet. Remove technical publications envelope and put them in a safe place.
WARNING
DO NOT LIFT without holding unit in upright position. Otherwise, unit will fall over and could cause injury
to personnel.
d. Lift air conditioner from bottom (base).
4-3