TM 9-4120-403-14
Section V UNIT MAINTENANCE PROCEDURES
4-10.
GENERAL
The procedure in this section have been arranged in the order in which the items appear in the unit (O) maintenance
level column on the Maintenance Allocation Chart (MAC) which is provided in Appendix B. Step-by-step procedures have
been provided for all actions authorized to be performed by Unit Maintenance in the order in which they appear on the
MAC.
WARNING
Panels, covers, screens, grilles, and guards installed on unit are there for a purpose.
Do not operate unit with them off or open unless instructions tell you to. When necessary, do so with care.
4-11. AIR CONDITIONER (FABRIC) COVER
This task covers:
a. Removal
c. Lubrication
e. Installation
b. Cleaning
d. Inspection
INITIAL SETUP
Tools
Tool Kit, Refrigeration
Materials/Parts
Rags
Detergent
Silicone
Rain Seal Washers
4-22