TM 9-4120-403-14
Installation
(1)
Install insulating heat shrink tubing over wires.
(2)
Solder leads in place using tags and wiring diagram. (See fig. 4-43,)
(3)
Slide heat shrink tubing over splices and remove tags.
(4)
Heat shrink insulating tubing.
(5)
Install relay on bracket with four screws and locknuts.
(6)
Secure bracket and relays with three screws.
(7)
(8)
Secure junction box cover with four captive panel fastener screws.
Follow-on procedure: Install junction box. (See para 4-32.)
4-88