TM 9-4120-404-14
3-19. ACCESS PANEL.
This Task Covers:
a. Removal
b. Cleaning
c. Repair
d. Installation
Initial Setup:
Tools Required
Tool Kit, Semite, Refrigeration, Unit (Item 1, Appendix B)
Material/Parts Required
Equipment Condition
Air conditioner shut down and cool.
WARNING
HIGH VOLTAGE
is used in operation of this equipment.
DEATH ON CONTACT
may result if personnel fail to observe safety precautions.
Never work on electrical equipment unless there is another person nearby who is
familiar with operation and hazards of equipment and who is competent in
administering first aid. When technician is aided by operators, he must warn them
about dangerous areas.
Whenever possible, input power supply to equipment must be shut off before beginning
work. When working inside, after power has been turned off, always ground every part
before touching it. Be careful not to contact high voltage connections when installing or
operating this equipment.
Whenever nature of operation permits, keep one hand away from equipment to reduce
hazard to current flowing through vital organs of body. Do Not operate equipment without
all guards, louvers, and covers in place and tightly secured.
(1) Remove eight screws (1) and access panel (2) from air conditioner (3).
(2) If gasket material is being replaced, remove gas ket (4) from access panel (2).
3-46