TM 9-4120-407-14
4-27. SOLENOID VALVE REPLACEMENT. (Cont)
(1) Secure valve body to bracket (13) with two screws (11) and lock washers (12).
(3) Install diaphragm (8) into valve body (9) and gasket (7) into tube and plunger assembly (6).
(4) Secure tube and plunger assembly (6) to valve body (9) with two screws (5).
(5) Slide coil (3) and data plate (2) onto valve body stem (4). Secure with nut (1).
NOTE
FOLLOW-ON MAINTENANCE:
Install new refrigerant desiccant dehydrator. See para 4-20.
4-28. LIQUID SIGHT INDICATOR REPLACEMENT.
b. Installation
This task covers:
a. Removal
Service Refrigeration Unit Tool Kit
(1) Remove two screws (1), flat washers (2), and bracket (3) being careful not to drop bracket into the
air conditioner.
(2) Carefully remove gasket (4) and spacer (5).
(3) Debraze liquid sight indicator (6) connections from tubing (7) to remove. See paragraph 4-14.
(1) Position liquid sight indicator (6) on tubing (7) and braze. See paragraph 4-14.
(2) Install spacer (5) and gasket (4) on liquid sight indicator.
(3) Position bracket (3) in place and install two screws (1) and flat washers (2).
4-64