TM 9-4120-408-14
Table 4-1. Unit Preventive Maintenance Checks and Services for Control Module Assembly.
(Continued)
Item
Item To Be
Not Fully
No
Interval
Checked or Serviced
Procedure
Mission Capable If:
3
SEMI-
Switches
Inspect switches for burns
Switches are
ANNUALLY
and damage.
damaged or burned.
4
SEMI-
Light Emitting
Inspect for burned or
Electrical leads
ANNUALLY
damaged electrical leads.
are burned or
Inspect for crackedor damaged.
Cracked
damaged light. or damaged light.
5
SEMI-
Terminal Boards
Inspect for burned or
Terminal boards are
ANNUALLY
damaged terminal boards.
burned or damaged.
Figure 4-2. Unit PMCS Routing Diagram (Condenser Assembly).
4-5