TM 9-4120-408-14
SECTION II. MAINTENANCE ALLOCATION CHART
FOR
AIR CONDITIONER: SPLIT PACK
30,000 BTUH, 28VDC (CONTINUED)
(4)
(1)
(2 )
(3)
(5)
(6)
Maintenance Level
Unit
Direct
General
Tools &
Group
Maintenance
Unit
Support
Support
Depot Eqpt. Remarks
Number
Component/Assembly
Function
CO
F
H
D
Ref Code Code
Pressure
Inspect
0.1
0.3
1
C
Switches
Test
6.0
1, 7, 9
Adjust
6.5
1, 7, 9
D
Replace
6.0
1, 7, 9
Terminal
Inspect
0.1
1
Board, Single Replace
1.0
1
Row
Tubing and
Inspect
0.1 0.1
6.5
1
C, E
Fittings
Replace
9.0
1, 7, 9
F
Repair
9.0
1, 7, 9
F
Receiver,
Inspect
0.1
1.0
1
C
Liquid Line
Replace
8.0
1, 7, 9
F
Inspect
0.1
1.0
1
C
Filter Dryer, Replace
8.0
1, 7, 9
F
Refrigerant
Coil,
Inspect
0.1
6.2
1
C
Service
6.3
1, 11
Replace
9.0
1, 7, 9,
F
10
Repair
10.0
1, 7, 9,
F, G
10
Housing,
Inspect
0.1
6.3
1, 7, 9,
H
14
Replace
9.5
1, 7, 9,
14
Repair
11.0
1, 7, 9,
A, I
14, 15
02
Control Module
Assembly
Panel, Top
Inspect
0.1 0.3
1
Replace
0.3
1
Switch,
Inspect
0.1 0.1
1
J
Rotary, Cam
Test
1.5
1
Actuated
Replace
1.0
1
Assembly,
Inspect
0.1 0.1
1
Test
0.5
1
Emitting
Replace
1.0
1
Repair
1.0
1, 5
B-5