Before hooking up the LVCT or changing hookup, make certain
load bank switch (2) is off and control knobs (10) and (20)
are turned completely counterclockwise (off)
After each test, turn field rheostat (7) completely counter-
clockwise to remove current from generator, then turn off load
bank switch (2)
Each model LVCT has its own load bank duty and cooling
cycle. This is normally 3 minutes on and 27 minutes off (for
cooling), based on a full load capacity (100 amps). For lesser
load application, the ON-OFF cycle can be reduced accordingly
Follow the test sequence as given and eliminate minor
electrical problems first
Now take your LVCT with the marked-in numbers and make
your test hookup according to the identification numbers given
for each test. THE LVCT IS A FINE PIECE OF EQUIPMENT.
TAKE CARE OF IT AND IT WILL HELP YOU
23