TM 9-4910-663-12
Initial Control Positions - Continued
Table 2-1.
Index and
Position
fig no.
Control
OFF
FIELD SHORTING switch
CW until re-
STARTER RHEOSTAT control
sistance is
felt, then
back off one
full revolu-
tion
OFF
STARTER TEST switch
OFF
AUX START switch
OFF
CHARGE TIMER (MINUTES) control
Fully
BATTERY CHARGE CIRCUIT control
CCW
Fully
CCW
0-32 VDC control
OFF
Any
Reversing switch
OFF
AC/DC SYSTEMS EQUALIZER
COIL TEST switch
OFF
AC/DC SYSTEMS IGN SW switch
OFF
Link between regulator G+ and
OFF
Link between regulator G- and
regulator B- binding posts
D-SENSING switch
ON
NOTE :
2-22