TM
9-4910-663-12
Code
Explanation
C
Operator/crew
O
Organizational maintenance
F
Direct support maintenance
H
General support maintenance
D
Depot maintenance
e. Work Measurement Time. The active repair time required to
perform the maintenance function shall be included directly below the
symbol identifying the category of maintenance.
f. Column 5, Tools, and Equipment and Remarks. This column shall
be used to specify, by code, those tools and test equipment required
to perform the designated function.
NOTE
Columns not utilized in this maintenance alloca-
tion chart are considered not applicable to this
equipment.
MAINTENANCE ALLOCATION CHART
Section II.
Table D-1.
1
2
3
GROUP
MAINTENANCE
NUMBER
COMPONENT/ASSEMBLY
FUNCTION
00
TEST STAND
INSPECT
REPLACE
REPAIR
PANEL ASSY BINDING
01
INSPECT
POST
REPLACE
REPAIR
RECTIFIER CHAMBER
02
INSPECT
ASSY
REPLACE
REPAIR
03
BATTERY COMPARTMENT
INSPECT
ASSY
REPLACE
REPAIR
04
INSTRUMENT PANEL
INSPECT
ASSY
TEST
SERVICE
ADJUST
REPLACE
REPAIR
Change 1 D-3