TM 9-4935-481-14-1
Table 3-11. DMS-D (10275000) Performance Test
Table 3-11. DMS-D Performance Test-Continued
STEP
UNIT
PROCEDURE
CORRECTIVE ACTION
STEP
UNIT
PROCEDURE
CORRECTIVE ACTION
WARNING
NOTE
Use extreme care when removing the front panel to
The major units and panels will be identified
prevent injury to personnel or damage to equipment.
as indicated below.
Place the aisle maintenance bench (see TM-O2819D-15 or
DMS-D
TM-O6895A-15) in front of the DMS-D, and use it to
DMM
support the front panel assembly if removed for
CT
COUNTER-TIMER
maintenance.
PP
POWER panel
NOTE
MCP
MONITOR/CONTROL panel
If at 4th echelon ensure the DMS-G is NOT cabled to
CIP
COUNTER INHIBIT(SEC) panel
the DMS-D.
ITP
INTERNAL TEST panel
NOTE
TP
TRAINER panel
For fault isolation where marked by a
, see
TKP
TRACKER panel
pages at the end of this table. Otherwise refer to
PPE
PROG PERFORM EVAL panel
schematic diagram and components location in Chapter 4.
TPS
TRIGGER PULSE SIM panel
Faul isolation .
A
and
B
follow last pages
VWS
VERT WIRE SIM panel
of A.
's.
HWS
HORIZ WIRE SIM panel
Supply Voltages
SDS
SUM/DIFF SIM panel
2
MCP
SELECTOR A switch to I-5.
RS
RATE SIM panel
3
PP
MAIN POWER and DMS switches to ON.
PD
PEAK DETECTOR PANEL
4
TP
Momentarily actuate TEST START switch.
OSC
1
5
DMM
Observe a reading of -24.50 to -25.50 Vdc.
1
3-77