TM 9-2330-205-14&P
OPERATOR/CREW Preventive Maintenance CHECKS AND SERVlCES - CONTINUED
B-BEFORE
D-DURING
A-AFTER
ITEM TO BE INSPECTED
INTERVAL
PROCEDURE: CHECK FOR AND HAVE
ITEM
REPAIRED, FILLED, OR ADJUSTED
EQUIPMENT IS NOT
NO.
B
D
A
AS NEEDED
READY/AVAILABLE IF:
10.
*
AIR RESERVOIR
Open draincock (1) to drain
reservoir and close when
finished.
11.
*
FRAME AND SUSPENSION
Check frame and suspension
for damage.
Section Ill. OPERATION UNDER USUAL CONDITIONS
Page
Page
After Use ............................................. 2-14
Preparation for Use ..................................... 2-9
Operation ............................................ 2-13
PREPARATION FOR USE
Perform the operator/crew preventive maintenance checks and services in the Before (B) column before continu-
ing with the following procedures.
WARNING
All persons not involved in coupling operation must stand clear of
towing vehicle and trailer to prevent possible injury.
1.
Review and perform towing vehicle operating procedures to prepare towing vehicle for coupling.
TA223294