TM 9-2330-227-14&P
WINDOWS
This task covers:
INITIAL SETUP
Tools
Materials/Parts
Hammer, ball-peen, 2-lb
Knife, putty
Pliers, long round-nose
Pliers, slip-joint
Solvent, drycleaning, PD-680 (item 18,
Screwdriver, cross-tip, number two
Screwdriver, flat-tip, 1/8-inch
Screwdriver, flat-tip, 3/16-inch
Personnel Required
Stepladder (two required)
Two
ACTION
LOCATION
ITEM
REMARKS
NOTE
All windows are maintained the same way. This task is for one; repeat for the others.
REMOVAL
1. Handle (1)
Clip (2)
Using slip-joint pliers, bend and take off.
HandIe (1)
2. Window assembly (3)
a. Release latch (4), and hold.
inside latch (4),
b. Have assistant lift window (3) up
and screen (5)
until handle (1) clears screen (5).
c. Let handle (1) hang vertically, and
swing window (3) down.