TM 9-2330-247-14&P
S e c t i o n Il. FRAME AND TOWING ATTACHMENTS M A I N T E N A N C E
Page
Page
Safety Chains . . . . . . . . . . . . . . . . . . . . . . .
Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
FRAME
5-3.
For information on frame repair, refer to TM 9-237 and TB 9-2300-247-40.
SAFETY CHAINS
This Task Covers:
b. Installation
a.
Removal
Initial Setup:
Materials/Parts:
Tools/Test Equipment:
C-clamp
Grinder, portable
References:
Torch, acetylene
TM 9-237
Welder, arc
ACTION
REMARKS
ITEM
LOCATION
NOTE
Both safety chains are replaced in the same way. This procedure is for one; repeat for
the other.
REMOVAL
a. Using chalk, mark for installation.
1.
Bracket (3)
Frame (1)
b. Using torch, cut off.
with safety
chains (4)
Using grinder, grind until surface is smooth.
Weldment (2)
2.
INSTALLATION
NOTE
For welding, refer to TM 9-237.
a. Put in place according to location marks.
Bracket (3)
3.
b. Using welder, weld.
with safety
chains (4)