Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES,
0042 00
INCLUDING LUBRICATION INSTRUCTIONS - Continued
Semiannual PMCS Procedures for Trailer (Field Level) - Continued
Table 10. Preventive Maintenance Checks and Services (PMCS) - Semiannual (Field Level) -
Continued.
FIELD-LEVEL MAINTENANCE
EQUIPMENT
ITEM
INTERVAL
MAN-  ITEM TO BE
PROCEDURE
NOT READY/
NO.
HOUR CHECKED OR
AVAILABLE IF:
SERVICED
10
Semiannual
Axle Bogie
2. Check if six months have passed
(MTVT) -
since axle bogie (25) has had oil
Continued
changed. If oil has not been
changed, perform the following:
a. Remove six screws and axle bogie
cover (26) from one side at a time.
b. Raise axle on opposite side of
trailer to allow oil to drain out.
c. Lower axle and repeat on other
side of trailer.
d. Apply thin bead of silicone
adhesive sealant 593 to seating
surface of housing (27).
e. Position cover (with fill plug at the
1 o'clock position) and six screws on
housing.
f. Tighten six screws to 24 lb-ft (32
Nm).
0042 00-72


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business