Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES,
0042 00
INCLUDING LUBRICATION INSTRUCTIONS - Continued
Semiannual PMCS Procedures for Trailer (Field Level) - Continued
Table 10. Preventive Maintenance Checks and Services (PMCS) - Semiannual (Field Level) -
Continued.
FIELD-LEVEL MAINTENANCE
EQUIPMENT
ITEM
INTERVAL
MAN-  ITEM TO BE
HOUR CHECKED OR PROCEDURE
NOT READY/
NO.
AVAILABLE IF:
SERVICED
10
Semiannual
Axle Bogie
2., Continued
(MTVT) -
Continued
g. Remove plug from cover and plug
from top of axle bogie housing.
h. Refill axle bogie with GO specified
for the ambient temperature, until
level with port on housing cover.
i. Install plugs in cover and housing.
AXLE BOGIE
Interval: S
Temperatures
Above
+40F to -
-15F to -
+40F
15F
50F
(Above
(+4C to -
(-26C to -
+4C)
26C)
46C)
GO-
GO-75W
GO-75W
75W
11
Semiannual
Trailer
Inspect trailer exterior for evidence of
Exterior
corrosion damage such as surface
color change, surface separation,
seam separation, blistered paint, rust-
through, in accordance with TB 43-
0213.
0042 00-73


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business