TM 9-2350-222-10-2
OPERATE WINCH (PREPARE FOR WINCHING OPERATIONS) - Continued
13. Turn two cable guide pins (K) until tabs (L) aline with slots (M).
Pull out guide pins (K) from supports.
14. Move WINCH CONTROL lever (N) down to pay out cable.
15. Release WINCH CONTROL lever (N) when cable lifting hook
(P) is loose on retaining eye (Q).
TA132411
2-271