TM 9-2350-222-10-2
OPERATE WINCH (PERFORM DIRECT WINCHING) - Continued
NOTE
Winching speed with two lines will be half the speed of
single line operation.
18. Move WINCH CONTROL lever (R) up to reel in cable (N) and load
(S).
19. Traverse turret (page 2-502) back and forth to keep winch (U) in line
with cable (N). Maintain tight and even coils (W).
20. Move WINCH CONTROL lever (R) down to release tension on cable
(N).
21. Remove snatch block (F) from load (S).
TA132421
2-281