TM 9-2350-277-10
PERFORM POST-FORDING OPERATIONS
THIS WORK PACKAGE COVERS:
INITIAL SETUP:
Maintenance Level
Equipment Condition
Operator
Personnel Required
Driver
Crew
PERFORM POST-FORDING OPERATIONS
1.
Drive carrier to firm, level ground. See task: DRIVE CARRIER (WP 0023 00).
2.
Place BILGE PUMPS switch OFF when water stops coming out bilge outlets.
3.
4.
Check trim vane for damage. Stow trim vane. See task: LOWER/STOW TRIM VANE (WP 0039 00).
5.
Check for water in final drive oil (WP 0090 00). If bubbles or white color are seen on dipstick, oil has water in it. Notify
unit maintenance.
6.
Lubricate carrier chassis (WP 0090 00) as soon as tactical situation permits.
CAUTION
Heater can be damaged during flushing if water gets into inlet or exhaust pipes. Cover heater
inlet and exhaust pipes before flushing carrier.
Do not directly or indirectly wash power enclosure, power supplies, computer equipment, or
electrical outlets on M1068A3. Electrical shorts may occur when operated next time.
Do not directly or indirectly wash the weapon station, external or internal radio equipment,
power enclosure, or computer equipment on the M1068A3.
7.
If carrier has been in salt water, flush outside with fresh water. Remove all drain plugs and flush bilges with fresh water.
Keep water away from radios and all electrical wiring. Install drain plugs.
END OF TASK
Change 2