ARMY TM 9-4120-380-14
NAVY EE-000-BA-MMA-010 7053-AC
AIR FORCE TO 35E9-136-21
5.40 REFRIGERANT STRAINER (F2). This task covers inspection, removal and installation.
INITIAL SETUP
Tools:
Tool kit, service, refrigeration unit (Item 1, Appendix B)
Personnel: 1
Equipment Conditions:
(1)
(2)
Disconnect input power to the air conditioner before performing any Internal
maintenance. Voltages used can KILL. Shutting the unit off at the control panel does
not disconnect unit power.
(3) Disconnect air conditioner input power at source
INSPECTION
a.
Inspect for evidence of leaks, kinked, or otherwise damaged line, and loose or missing mounting hardware
b.
REMOVAL
a.
Remove two flarenuts ( 1) and (4) and lines.
b.
Loosen screw (6) and locknut (5).
c.
Remove refrigerant strainer (2) from clamp (3).
INSTALLATION
a.
Install refrigerant strainer (2) into clamp (3).
b.
Tighten screw (6) and locknut (5).
c.
Install two flarenuts (1) and (4).
d.
5-99