TM 55-1925-284-14&P
0005 00
Table 2. Valve Alignment for Sewage Holding Tank To Shore Connection (continued)
Item
Valve
Function
Position During Operation
Number
Number
Under Usual Conditions
(Figure 3)
13
MSD-13
WET WELL DRAIN TO HOLDING TANK
CLOSED
14
MSD-14
MSD DISCH PUMP GAGE ISLN
CLOSED
15
PD-4
WASTE WTR TO SEW HLDG TANK
OPEN
16
PW-100
POTW ISOLATION
CLOSED
17
SD-1
SEWAGE INLET TO MSD
CLOSED
18
SD-2
SEWAGE OVERBOARD DISCHARGE
CLOSED
19
SD-3
SEWAGE DRAIN TO HOLDING TANK
CLOSED
20
SD-4
COV-SEW DISCH PMP NO. 2 SUCT
CLOSED
21
SD-5
COV-SEW DISCH PMP NO. 1 SUCT
CLOSED
22
SD-6
COV-SEW DISCH PMP NO. 2 DISCH
CLOSED
23
SD-7
COV-SEW DISCH PMP NO. 1 DISCH
CLOSED
24
SD-8
SEWAGE OVERBOARD DISCHARGE
CLOSED
25
SD-9
SEWAGE TO SHORE CONN
CLOSED
26
SD-10
SEWAGE SHORE CONN PORT
CLOSED
27
SD-11
SEWAGE SHORE CONN STBD
CLOSED
28
SD-12
MSD OVERBOARD DISCH PMP DISCH
CLOSED
29
SD-13
SEWAGE OVERBOARD DISCHARGE
CLOSED
30
SD-19
SEW PMP NO. 1 DISCH PRESS GAGE
CLOSED
ISLN
31
SD-20
SEW PMP NO. 2 DISCH PRESS GAGE
CLOSED
ISLN
4. Set to ON the ENGINE ROOM POWER PANEL NO. 1 circuit breaker (figure 1, item 3) at the main switch-
board (figure 1, item 2) in the EOS.
5. To operate sewage discharge pump No.1 (figure 3, item 39), set to ON the SEWAGE DISCHARGE PUMP
No. 1 circuit breaker (figure 5, item 1) in the 440V power panel No. 1 (figure 5, item 2).
6. OPEN SD-5 (figure 3, item 21), SD-7 (figure 3, item 23), SD-9 (figure 3, item 25), SD-19 (figure 3, item 30).
To pump to the port shore connection, OPEN SD-10 (figure 3, item 26). To pump to the starboard shore
connection, OPEN SD-11 (figure 3, item 27).
0005 00-7