7. To operate sewage discharge pump No. 2 (figure 3, item 40), set to ON the SEWAGE DISCHARGE PUMP
No. 2 circuit breaker (Figure 5 item 3) in the 440V power panel No. 1 (Figure 5, item 2).
2
1
3
Figure 5. 440V Power Panel No. 1
8. OPEN SD-4 (figure 3, item 20), SD-6 (figure 3, item 22), SD-9 (figure 3, item 25), and SD-20 (figure 3,
item 31). Ensure that SD-8 (figure 3, item 24) is closed. To discharge to the port shore connection,
OPEN SD-10 (figure 3, item 26). To pump to the starboard shore connection, OPEN SD-11 (figure 3,
item 27).
9. Set the ON/OFF switch (figure 6, item 1) to the applicable SEWAGE DISCHARGE PUMP CONTROLLER
(figure 6, item 2) to ON.
10. Press the START button (figure 6, item 3). Verify that the motor run light (figure 6, item 4) is illuminated.