TM 55-1925-284-14&P
0012 00
ITEM
INTERVAL
MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
5
Weekly
0.2
Effluent Water
Visually inspect the effluent water in
the wet well. Water should be clear
and free of particulate. If not, perform
the residual chlorine test
6
Weekly
0.5
Chlorinator
Check the tablets in the chlorinator.
5 to 10 tablets should be present at all
times. Add tablets as necessary
7
Weekly
0.2
Blower
Apply general purpose grease (item 2,
two zerk fittings on the blower until
old grease exits the relief ports.
GREASE FITTINGS
RELIEF PORTS
8
Monthly
0.3
Effluent Water
Perform the residual chlorine test
9
Monthly
0.3
Media Tank,
Check the media tank, piping, wet
Class III leakage.
Chlorinator,
well, chlorinator, valves, and discharge
Piping
pump for leakage and proper operation.
10
Monthly
0.5
Wet Well
Clean the wet well inlet strainer
11
Quarterly
1.0
Media Tank
Perform air scour and pump out of
12
Quarterly
0.3
Blower
END OF WORK PACKAGE
0012 00-2