TM 9-2320-211-10-1
f.
Rigging Crane Lines.
FRAME 1
1.
To rig two-part line:
(a) Place crane hoist cable (1) over one boom sheave and down through
boom (2) end.
(b) Put crane hoist cable around block sheave (3).
(c) Aline holes in clevis (4) and boom (2) and place anchor pin (5)
through holes.
(d) Put pin (6) through hole in anchor pin (5) and close pin.
GO TO FRAME 2