TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
2-83. TOW M966 (CONT).
(15) Drive wrecker forward several feet and park (para 2-11o).
(16) Remove two quick pins (17) and pins (18) from M966 adapters (19).
(17) Remove extensions (15) from M966 adapters (19) and stow.
(18) Install two pins (18) in M966 adapters (19).
(19) Install two quick pins (17) in pins (18).
WARNING
As springs and end caps are removed, crosstube can
swing in all directions, adapters may slide off, and can
cause personal injury.
(20) Remove two springs (10) from tow cylinders (12).
(21) Remove quick pins (20) and pins (21) from end caps (22).
(23) Remove two M966 adapters (19) from crosstube (11) and place on
equipment body floor (23).
(23.1) Remove and stow two 5-in spacers (23.1) from crosstube (11).
Change 1