TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
a. Perform Emergency Hydraulic Operation When Crane Electrical
Power Fails.
(1) If crane electrical power system fails during crane operation, crane will
be locked in position it was in at time of failure.
(2) Do not try to operate any electrical equipment on vehicle or crane.
(3) Do not try to repair electrical system.
NOTE
This procedure will provide emergency hydraulic
q
power to lower crane and load when electrical power
has failed.
Screwdriver can be put in slot in front of solenoid
q
valve button to hold button in while operating
controls.
(4) Push up and
hold solenoid valve
button (l).
(6) Notify organizational maintenance.