TM 9-2320-366-10-2
2-50. WRECKER MATERIAL HANDLING CRANE (MHC)
OPERATION (CONT)
c. Set Up Outriggers.
WARNING
Area must be clear on both sides of vehicle before extending
outriggers. Failure to comply may result in serious injury to personnel.
(1) Move O/R JACK lever (1) to OUT position until outriggers are fully extended.
NOTE
Both outrigger pads are installed on outriggers the same way.
Right
outrigger pad shown.
(2) Remove two outrigger pads (2) from tool box.
(3) Remove two pins (3) from outrigger pad (2).
(4) Clean all dirt and debris from socket (4) in outrigger pad (2) and from end of outrigger
(5).
(5) Install outrigger pad (2) on end of outrigger (5) with pin (3).
2-668