TM 9-2320-366-10-2
This task covers:
a. Spare Tire Stowage (Vehicles Not
d. Spare Tire Retainer and Davit
Equipped with Machine Gun Ring)
Preparation
b. Spare Tire Stowage (Vehicles
e. Slide Assembly Installation
Equipped with Machine Gun Ring).
f. Load Spreader Installation
g. Follow-On Maintenance
c. Cab Preparation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
Vehicle parked on level ground.
Strap Assembly (Item 23 (COEI),
Engine shut down (para 2-27f).
Wheels chocked (para 2-27h).
Sling Assembly, Air Drop Roof (Item 22
(Vehicles not equipped with machine
Crane, Light Material Handling, Kit
gun ring).
Side panels stowed (para 2-32k).
(Vehicles equipped with machine gun
ring)
Tools and Special Tools
Wrench Assembly, Speedhandle
(Vehicles equipped with machine gun
ring)
Wrench, Adjustable, 8 in. (Item 50,
Personnel Required
(3)
a. Spare Tire Stowage (Vehicles Not
Equipped With Machine Gun Ring).
NOTE
Steps (1) through (24) require
the aid of an assistant.
(1) Unlatch three clamps (1) and remove
davit (2) from rear panel (3).
Change 1