TM 9-2320-366-10-2
REMOVAL/INSTALLATION
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Engine shut down (2-27f).
a. Removal.
(1) Pull two spring catches (1) and lift
(2) Release two latch hooks (3) from
two strike plates (4).
(3) Remove PDP
cover
(5)
from
dashboard (6).
b. Installation.
(1) Position PDP
cover
(5)
on
dashboard (6).
(2) Fasten two latch hooks (3) on two
strike plates (4).
(3) Push down on two latch levers (2)
until spring catches (1) are engaged.
End of Task.