TM 9-2320-387-10
a. Operation.
(1) Depress two lockbuttons (6) on locking pins (5) and remove locking pins (5)
from locking lugs (9) and holes (4) securing platform (1) in stowed position (13).
NOTE
Ensure footman loops are laid out flat behind platform when securing
platform in stowed position.
(2) Grasp hand hold (2) on platform (1) to lift platform (1) to either half-
height position (12) or full-height position (11).
(a) If half-height position (12) is required, lift platform (1) all the way up
and turn two latches (7) so ledges of latches (7) are facing up and parallel to bottom
edge of platform (1). Lower platform (1) and allow to rest on ledges of latch (7) at
half-height position (12). Insert locking pins (5) through locking holes (4) in
platform (1) and holes (10) in platform risers (8).
(b) If full-height position (11) is required, lift platform (1) to full-height
position (11), and ensure locking holes (3) in left and right sides of platform (1) are
aligned with locking holes (10) in platform risers (8). Insert locking pins (5) through
locking holes (3) in platform (1) and holes (10) in platform risers (8).
b. After operation.
(1) Remove locking pins (5) securing platform (1) in either half-height
position (12) or full-height position (11) by pressing lockbuttons (6) and removing
locking pins (5). Lift up on platform (1), and turn two latches (7) so ledges of
latches (7) are facing downward, to floor.
(2) Lower platform (1) to stowed position (13) and align holes (4) with locking
lugs (9). Insert locking pins (5) through holes (4) and lugs (9).
4
7
10
1
11
12
8
13
4
3
Change 2
2-102.1/(2-102.2 blank)