TM 9-2330-205-14&P
Section XII. SPRING
Page
Page
Spring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-88
Spring Shackle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SPRING
This task covers:
INITIAL SETUP
Tools - Continued
Tools
Socket, 1
1/8- by 1/2-inch
Floor jack, hydraulic
square
drive
Handle, reversible, 1/2-inch
Socket, 1
1/4- by 3/4-inch
square drive
square
drive
Handle, reversible, 3/4-inch
square drive
Personnel Required
Jack stands, two large
Jack stands, two small
Two
Mallet, plastic
ACTION
ITEM
REMARKS
LOCATION
REMOVAL
Floor jack (2)
Raise trailer until tires clear ground.
1.
Axle (1)
Two jack stands (4)
Position stands (4) to support trailer.
2.
Chassis (3)
Floor jack (2)
Lower axle (1) so tires are on ground.
3.
Axle (1)
Jack stands (4) will hold weight off
springs.
TA223358