TM 9-2330-211-14&P
4-39.
RIGHT LANDING GEAR LEG
This Task Covers:
d.
Inspection and Replacement
a.
Removal
Assembly
e.
b. Disassembly
f.
Installation
c.
Cleaning
Initial Setup:
Tools/Test Equipment (Con't):
Materials/Parts:
Hoist, 5 ton, with cables
Key, socket-head,
in.
Pliers, slip-joint, angle nose
Puller kit, mechanical
in.
Punch, drive-pin,
Personnel Required: Two
Retrieving tool, magnetic
References: TM 9-214
Screwdriver, flat-tip
Socket,
in., in. drive
Tools/Test Equipment:
Socket, 1 in., in. drive
Wrench, open-end, in.
Container, 1 gallon capacity
in.
Wrench, open-end,
Drift, brass, in.
in. (two required)
Wrench, open-end,
Hammer, hand, ball-peen, 3 pound
in.
Wrench, open-end,
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
1.
Corners (4)
Semitrailer (1)
b. Using hoist, lift front of semitrailer until both
corners (4) are approximately 38 in. (96.5 cm) off
ground.
Extend as far as possible
Lower leg tube (3)
2.
Landing gear
4-126