TM 9-2330-213-14&P
3-8. WHEEL REPLACEMENT (Con't).
(3) Position floor jack under axle (3) near wheel (1) to be removed, and raise trailer until wheel is
off ground.
(4) Remove six nuts (4).
(5) Remove wheel (1) from wheel studs (2).
b. Installation.
(1) Position wheel (1) on wheel studs (2).
(2) Install six nuts (4) fingertight.
(3) Lower floor jack until wheel (1) is on ground. Remove floor jack.
(4) Tighten six nuts (4) using tightening sequence shown. Have unit maintenance tighten nuts to
340-370 Ib. -ft. (461-502 N.m) as soon as possible.
TA506260
3-12