TM 9-2330-285-14&P/TO 36A11-21-10-1
OPERATOR/CREW PREVENTIVE MAINTENANCE CHECKS AND SERVICES - CONTINUED
B-BEFORE
D-DURING
A-AFTER
M-MONTHLY
W-WEEKLY
ITEM TO BE INSPECTED
PROCEDURES: CHECK FOR AND
ITEM
HAVE REPAIRED, FILLED OR
EQUIPMENT IS NOT
NO.
ADJUSTED AS NEEDED
READY/AVAILABLE IF:
AIR SPRINGS
5
Adjust all air springs to the
correct pressure for the load
being carried.
Load off
Load on
3000 lb
26 psig
36 psig
4000 lb
32 psig
44 psig
43 psig
5000 lb
58 psig
6000 lb
52 psig
70 psig
6
AIR RESERVOIR
WARNING
Wear goggles when opening drain-
cock on air reservoir.
Inspect air reservoir for signs
of leakage or damage.
Open draincock (1) and drain all
moisture from reservoir.
TA 221629
2-14