TM 9-2330-285-14&P/TO 36A11-21-10-1
HANDBRAKE SYSTEM - CONTINUED
ACTION
ITEM
REMARKS
LOCATION
CABLE REMOVAL
NOTE
The following procedure is for the removal of one cable. The
procedure for the left or right side is the same. The
procedure for early or late model cables is also the same.
The only difference is the number of clamps holding the cable
to the axle beam. The following chart gives this
information:
APPLICATION
CLAMPS
2
Left side - early
Right side - early
3
Left side - late
0
1
Right side - late
a. While holding nut (3), remove nut (4)
Cable (2), nut
5 Left or right side
backing plate (1)
using two 7/8-inch wrenches.
(3) and nut (4)
b. Pull cable (2) from backing plate (1).
6 Lever end of cable
a. Remove cotter pin (5) using cutting
Cotter pin (5),
pliers.
pin (6) and two
b. Remove pin (6) and pull end of cable (2)
links (7)
free of two links (7).
c. Remove clamp (8) from cable (2).
Throw away cotter pin (5).
a. Remove from axle beam using a cross-tip
Clamps (9),
7' Rear axle beam
screwdriver.
screws (10) and
washers (11)
b. Spread clamps (9) and remove from
cable (2).
CABLE INSTALLATION
a. Push cable (2) through backing plate (1).
Cable (2), nut
8 Left or right side
b. While holding nut (3), install nut (4)
(3) and nut (4)
backing plate (1)
using two 7/8-inch wrenches.
a. Secure cable (2) to links (7) with
Cotter pin (5),
9 Lever end of cable
pin (6).
pin (6) and
b. Install new cotter pin (5) using cutting
two links (7)
pliers.